Establishing a reliable project cost estimate early in a construction project is important for assessing financial viability, informing investment decisions and setting realistic budgets. However, detailed design information is often limited at the earliest project stages, making it difficult to determine what proposed work is likely to cost.
This is where independent benchmark data play a vital role. They give built environment professionals an evidence-based starting point from which to develop initial assumptions and assess how project-specific requirements might influence the overall cost.
BCIS Average Prices is one of BCIS’s most widely used modules for this purpose. With data from thousands of projects, it’s an invaluable tool for generating average rates across a broad range of building and asset types. It has particular relevance during RIBA Stages 0 to 2 or Gates 0 to 3 of the Gateway Review Process (formerly OGC Gateway), supporting cost planning as projects progress from strategic definition through preparation and briefing to concept design.
What is BCIS Average Prices?
BCIS Average Prices provides built environment professionals with access to independent project data collected by BCIS from the construction industry over more than six decades.
The module draws on BCIS’s database of analysed accepted projects, to derive average rates for a range of building types submitted to BCIS. They are based on the agreed price for the construction and will include the contractors’ overheads and profits included in the contract with preliminaries apportioned, but excluding external works, contingencies, fees, taxes and finance charges.
The data are organised by building functions which represent different project types, such as teaching hospitals, car parks or offices. There are more than 300 building functions across nine main categories, allowing subscribers to select and examine data relevant to their focus project.
| Building function main categories |
Example projects |
| Utilities, civil engineering facilities |
Railway station buildings
Air traffic control buildings
Coach stations and car parks |
| Industrial facilities |
Agricultural buildings
Factories
Warehouses |
| Administrative, commercial, protective facilities |
Law courts
Offices
Police stations |
| Health, welfare facilities |
Hospitals and specialist hospital facilities
GP and Dentist surgeries
Care Homes |
| Recreational facilities |
Restaurants
Community centres
Sports and recreational centres |
| Religious facilities |
Places of worship including mosques, churches, temples and synagogues
Mission halls and meeting houses
Crematoria |
| Educational, scientific, information facilities |
Schools
Universities
Laboratories |
| Residential facilities |
Housing (houses and flats)
Student accommodation
Hotels |
| Common facilities, other facilities |
Waiting rooms
Kitchens
Toilet blocks |
What is BCIS Average Prices used for?
BCIS Average Prices is primarily used for early-stage cost planning, helping professionals assess whether a proposed project is financially viable.
It is particularly useful for client-side quantity surveyors and cost consultants, providing an indication of what a client might expect to pay before detailed project information is available. Estimators can also use the service to benchmark their own calculations and assess whether their estimates are reasonable during the bid process.
By providing access to independent benchmark data, BCIS Average Prices can significantly reduce the time needed to develop initial estimates. In short, it provides a robust evidence base to justify assumptions used in feasibility assessments, business cases and project decision-making.
BCIS Average Prices also provides current building costs used for insurance reinstatement cost assessments, depreciated replacement cost appraisals and development appraisals.
How is BCIS Average Prices calculated and updated?
BCIS Average Prices is underpinned by construction project data shared with BCIS by the industry, primarily in the form of accepted tenders for actual projects.
BCIS holds a database comprising thousands of analysed projects, with records dating back several decades. When new project information is received, it is reviewed and analysed by BCIS’s data team, adjusted to a base date and categorised by location, before being incorporated into an existing building function sample, or used to create a new one. The displayed statistics are finally updated to current prices using BCIS All-in Tender Price Index (TPI). This is an ongoing process, with new project data analysed and added to relevant samples as they become available.
How to use BCIS Average Prices
BCIS Average Prices allows subscribers to select relevant project data and generate average rates for a whole project, group elements or individual components from the projects within their chosen sample. Subscribers can choose how the data are presented and rebase historical rates to reflect a specified time period or filter data by location. The process involves five main steps.
1. Choose a building function
Project data within BCIS Average Prices are organised by building function, with more than 300 functions divided into nine main categories and further subgroups. Using the service’s drop-down menus, subscribers can select the building function most relevant to their focus project. Alternatively, subscribers can use the ‘Filter’ button to search building functions by keyword. Selected building functions determine the initial sample of project data used to generate average rates.
Multiple building functions can be selected within a single search, allowing subscribers to generate average rates for different project types simultaneously. The results are presented separately for each function rather than combined into a single figure.
2. Select the required study
Subscribers then choose how they want the data to be presented and the level of detail required. Within BCIS Average Prices, this is referred to as selecting a ‘study’. For example, a subscriber looking for the broad average rate of an office building can select cost per square metre of gross internal floor area (GIFA), shown as £/m² in the service. This will provide broad average costs to build an office.
| Study |
Description |
Unit of measurement |
| Cost per square metre |
Provides rates for an entire building. Preliminaries are apportioned. Contingencies, external works and design fees are excluded. |
£/m² of gross internal floor area |
| Functional unit prices |
Provides rates in units appropriate to the selected building function, such as cost per number of places in a school. Preliminaries are apportioned. Contingencies, external works and design fees are excluded. |
£/functional unit |
| Group element prices |
Provides rates for grouped building elements, such as substructure and superstructure. Preliminaries are apportioned. Contingencies, external works and design fees are excluded. |
£/m² of gross internal floor area of the group element |
| Element cost per square metre |
Provides rates for building elements, such as internal doors and wall finishes. Excludes preliminaries, contingencies and design fees. |
£/m² of gross internal floor area of the element |
| Element unit rate study |
Provides rates for building elements, such as internal doors and wall finishes. Excludes preliminaries, contingencies and design fees. |
£/element |
| External works |
Provides rates for external works relevant to the building function. Includes preliminaries. Excludes contingencies and design fees. |
£/m² of gross internal floor area of all buildings analysed |
Alternatively, a more detailed breakdown may be required. Selecting element cost per square metre would generate average rates for individual building elements, such as internal doors or wall finishes. There are six studies available in total.
The chosen study determines how average rates are calculated and presented in the results. Regardless of the study chosen, rates are always derived from the selected project sample(s).
Depending on the study and available data, results may include the mean, median and lower and upper quartiles, providing different ways to assess the distribution of average rates within a sample.
3. Select type of work
Project data within BCIS Average Prices cover different types of construction work. Subscribers can refine their selected sample by specifying the type of work they want included in the average rates, such as new build or shell only. The available options depend on the types of work represented within the refined sample. Availability also depends on the building function and study selected. Some samples, for example, may contain only new build project data.
Subscribers can select all available work types or focus on those most relevant to their own project. Where multiple types are selected, the resulting rates are presented separately for each.
4. Rebase the data
One of the most powerful features of BCIS project data is the ability to rebase historical project costs to reflect the time period, and filter data by location, relevant to a focus project. BCIS’s project database contains decades’ worth of intelligence, meaning most average rates relate to projects undertaken under different market conditions from those facing the industry today.
To account for this difference, all projects in BCIS Average Prices are updated to a common date and location. Subscribers can use BCIS TPI to rebase the data to a specified year and quarter, and filter their sample geographically by using location factors. For example, focusing on office projects in the North West or, more specifically, Greater Manchester.
These adjustments help ensure historical project data remain relevant to the circumstances of the focus project, removing the need for an extensive, manual process of reviewing individual project records and rebasing costs.
Rebasing and sample selection in BCIS still require professional judgement. Narrowing a sample to a specific geographical area may provide more locally relevant comparators, but it can also reduce the number of projects available.
For early-stage benchmarking, where the aim is often to establish a broad indication of likely cost with limited project details in a short time frame, a larger sample may be more useful than a smaller, highly specific one.
Want to see rebasing in action? Book a free demonstration with the team.
5. Review and export the data
Once the chosen data have been rebased, BCIS Average Prices generates a results table showing the updated average rates. The table categorises results by selected building functions and types of work, with rates grouped separately where multiple options have been chosen.
The way rates are presented also depends on the selected study or studies and the data available. For example, when cost per square metre is selected, the results can show a range of rates, including the mean, median and lower and upper quartiles.
Providing a range of rates rather than a single average helps subscribers understand how rates vary within a sample and apply professional judgement when estimating their own project’s likely cost. Where available, the median, which shows the middle figure in the sample, is a useful reference point, particularly where unusually high or low rates could influence the mean.
Not every study provides the same range of results. At this stage, subscribers can adjust the maximum age of the projects included in their sample, either expanding or reducing the number of available records. This may change the average rates shown.
Subscribers can also explore rates in greater detail by selecting the linked building function, element or functional unit in the left-hand column. This provides a more granular breakdown of rates, such as additional percentiles and, where data are available, a scatter chart showing individual projects within the sample. Subscribers can click on each point in the chart to identify the corresponding published project, providing greater transparency over the data underpinning the average rates.
Once satisfied with their selection, subscribers can export the results in several formats, including spreadsheet, CSV and PDF files. The selected data can also be used in automatic cost calculators to produce an early cost estimate, insurance reinstatement cost assessment and a depreciated replacement cost appraisal.
These outputs provide a credible, recognised record of the data and assumptions used, helping professionals substantiate early cost advice, assess tender pricing and justify cost or pricing decisions with stakeholders.
Who can access BCIS Average Prices?
Data availability within BCIS Average Prices is determined by subscription type, with access tailored to the specific needs of different professionals.
BCIS CapX subscribers have access to the full module, including all study types and types of work. This comprehensive access supports feasibility assessments, cost planning and benchmarking across a wide range of projects.
BCIS OpX is tailored to asset management professionals, providing access to rehabilitation and conversion project data. Average prices are presented exclusively as costs per square metre, reflecting the focus on managing and maintaining existing assets.
BCIS ProtX is designed to support reinstatement cost analysis. It focuses on new build project data, with average prices presented exclusively as costs per square metre.
Find out more about BCIS Average Prices through a free demonstration with the BCIS team. Get in touch to arrange a demonstration or discuss questions about the service.
To keep up to date with the latest industry news and insights from BCIS, register for our newsletter here.
More BCIS Basics
Eight principles of benchmarking during market volatility
How to use BCIS PAFI in fluctuation clauses
Understanding preliminaries in construction
Are you using the right construction index?
Managing inflationary risk in construction
Taking the labour out of labour calculations
Six principles of benchmarking in construction
Six reasons to benchmark in construction
Using location factors in construction